House Progress Report Epi 8 (S02)

Ok...looks like the "season 2" of my house progress report is gonna be a pretty short one. At "episode 8" my story is about to finish. Yes! The renovation is finally nearing it's end! In fact, our contractor told us he's going to finish by tomorrow! Yippee!!!

Forgot to post this photo up yesterday, but could you believe buying a toilet bowl, a wash basin and bath accessories such as towel railing, hand shower, etc could amount up to rm900. Never take toilet bowls for granted again!


This was how the common bathroom looks like in the afternoon when we went over...


This is the rm900 toilet bowls and sinks...


The floor of the common bathroom before tiles were put up...


Called up the cabinet guy to come and do the final measurements before finalizing on the actual cabinet doors. As you can see, our cabinets would be from d format cabinet shop. Not too sure how is the quality like, but so far the service provided by our sales rep is pretty good!


Went to look at some lighting last night for the sitting room lighting. Not too sure which one we bought but we bought one of the 2 bulbs light. I think each costed us rm88 excluding the bulbs. The total came up to around rm220


Someone Trying out the LED lights in our shower head...yes! Our showerr head has led lights! Let's hope we don't get electrocuted while bathing...


This is how the common bathroom looked like when we went back at night. All in a day's work...


Have not been to the house yet today, but I guess the toilet bowls and fixtures should be installed by today.

And this here is the Armstrong ceiling boards all installed with the aluminum railings/fixtures